Steelarc Engineering's recent projects have included
BMA Goonyella Riverside
- Dragline boom walkways
- Masthead walkways
- Gantry walkways
- Lube tanks
- Lube rooms
- Compressor rooms
BMA Saraji
- Skids
- Pontoon refurbishment
BMA Peak Downs
- 150 x 304 grade stainless steel tool lockers
Theiss Lake Vermont
- Decant pipe work
- Walkway systems
Theiss Burton
- Pipe work – 32 x 12metre 300nb; 16 x 12metre 450nb
Vale Carborough Downs
- Pipe work
- Walkway systems
- Conveyor under pans
Rio Tinto Hail Creek
- Rebuilds of Komatsu 960E trayss
StemSafe
- 7 x Stemming trucks
Steelarc's maintenance team is available 24/7 and is manned by highly qualified tradesmen with extensive experience in mining operations and excellent safety records. Whether it's general maintenance or emergency repairs Steelarc provides the same high level of expertise they bring to all their jobs.